Open Modal

Work scheduled to start on 257 bridge near Otwell

Beginning today, Indiana Department of  Transportation Contractors will be closing one lane of the bridge over the East Fork White River on 257 near Otwell.  The bridge will be patched and resurfaced.  One lane of the bridge will be closed at all times until the work is done starting Monday March 9th.  The open lane will be restricted to 11 feet side so that means that over-sized and wide loads will need to seek an alternate route of travel.  A temporary traffic signal will control the one lane of traffic.
 

RecomMended Posts

Loading...